23-02-27
When the equipment system for the pressure test of the PE steel wire mesh skeleton is stable, increase the pressure to 1.5 times the working pressure, stabilize the pressure for 1 hour, carefully observe the pressure gauge, and patrol along the line, if there is no visible leakage during the test or A significant pressure drop occurs. When welding the replaced electric fusion pipe fittings, be sur